Connecticut Transportation Asset Management

Bridge

Fact Sheet Year:
Data Confidence
High
Bridge Pavement Traffic Signals Signs Sign Supports Pavement Markings Highway Buildings Illumination Retaining Walls Drainage Culverts ITS - ATMS
Download PDF 2024 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2023 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2022 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2021 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2020 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2019 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Download PDF 2018 Factsheet
Disclaimer: This site contains data for CTDOT's Transportation Asset Management Program, which is only a portion of the overall highway and bridge capital program. Currently, performance and investment data depicted in these graphs are only based on State of Good Repair projects and do not represent the entire Capital Plan.


Description

  • CTDOT inspects 5,513 roadway bridges, 1,823 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,004 of these bridges are state maintained; the remaining 1,509 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 55 years old, which is 9 years older than the national average of 46 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,440 roadway bridges, 1,823 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,054 of these bridges are state maintained; the remaining 1,386 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 56 years old, which is 9 years older than the national average of 47 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,433 roadway bridges, 1,822 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,058 of these bridges are state maintained; the remaining 1,375 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 55 years old, which is 7 years older than the national average of 48 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,429 roadway bridges, 1,821 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,044 of these bridges are state maintained; the remaining 1,385 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 53 years old, which is 9 years older than the national average of 44 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,394 roadway bridges, 1,795 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,028 of these bridges are state maintained; the remaining 1,366 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 53 years old, which is 9 years older than the national average of 44 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,326 roadway bridges, 1,785 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,017 of these bridges are state maintained; the remaining 1,309 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 53 years old, which is 11 years older than the national average of 42 years. The state has a higher percentage of Poor bridges (by deck area) compared to the national average.

Description

  • CTDOT inspects 5,306 roadway bridges, 1,785 of which are National Bridge Inventory (NBI) structures on the National Highway System (NHS).
  • 4,016 of these bridges are state maintained; the remaining 1,290 are maintained locally or under another jurisdiction.
  • CTDOT defines a bridge as a crossing of at least six feet in length, including culverts. The Federal Highway Administration (FHWA) defines an NBI bridge as a structure measuring more than 20 feet in length.
  • CTDOT has a distinct Major Bridge Program for large or expensive-to-replace bridges. 60 structures are currently categorized as Major Bridges.

State of Good
Repair (SOGR)

A bridge for which the condition rating for each of the three major components for a span bridge (Substructure, Deck, and Superstructure) or the structural condition of a culvert is rated at least a 5 on a 0-9 condition scale is classified as being in a SOGR.

Bridge Age

The average NHS-NBI bridge in Connecticut is 53 years old, which is 11 years older than the national average of 42 years. The state has a higher percentage of Structurally Deficient (SD) bridges (by deck area) compared to the national average.

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,690 bridges
(66.9%)
NHS-NBI bridges
1,823 bridges
(26,341,827.0 ft2 deck area)
(33.1%)
Good
3,577,834 ft2
(357 bridges)
13.6% are in Good Condition
Fair
20,816,080 ft2
(1,419 bridges)
79.0% are in Fair Condition
Poor
1,947,913 ft2
(47 bridges)
7.4% are in Poor Condition

In this chart:

  • Based on CTDOT 3/15/23 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,509 bridges
(27.4%)
Maintained by CTDOT
4,004 bridges
(72.6%)
State of Good Repair
3,853 bridges (96.2%)
Poor
151 bridges (3.8%)

In this chart:

  • Based on CTDOT 3/15/23 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge as of 3/15/24

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge as of 3/15/24

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,617 bridges
(66.5%)
NHS-NBI bridges
1,823 bridges
(26,670,341.0 ft2 deck area)
(33.5%)
Good
3,749,993 ft2
(371 bridges)
14.1% are in Good Condition
Fair
20,881,090 ft2
(1,399 bridges)
78.3% are in Fair Condition
Poor
2,039,258 ft2
(53 bridges)
7.6% are in Poor Condition

In this chart:

  • Based on CTDOT 3/15/22 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,386 bridges
(25.5%)
Maintained by CTDOT
4,054 bridges
(74.5%)
State of Good Repair
3,909 bridges (96.4%)
Poor
145 bridges (3.6%)

In this chart:

  • Based on CTDOT 3/15/22 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge as of 2/9/23

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge as of 2/9/23

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,611 bridges
(66.5%)
NHS-NBI bridges
1,822 bridges
(26,690,852.0 ft2 deck area)
(33.5%)
Good
3,781,424 ft2
(378 bridges)
14.2% are in Good Condition
Fair
20,737,588 ft2
(1,391 bridges)
77.7% are in Fair Condition
Poor
2,171,840 ft2
(53 bridges)
8.1% are in Poor Condition

In this chart:

  • Based on CTDOT 3/15/21 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,375 bridges
(25.3%)
Maintained by CTDOT
4,058 bridges
(74.7%)
State of Good Repair
3,903 bridges (96.2%)
Poor
155 bridges (3.8%)

In this chart:

  • Based on CTDOT 3/15/21 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,608 bridges
(66.5%)
NHS-NBI bridges
1,821 bridges
(26,696,480.0 ft2 deck area)
(33.5%)
Good
3,852,111 ft2
(386 bridges)
14.4% are in Good Condition
Fair
20,669,117 ft2
(1,381 bridges)
77.4% are in Fair Condition
Poor
2,175,252 ft2
(54 bridges)
8.2% are in Poor Condition

In this chart:

  • Based on CTDOT 3/13/20 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,385 bridges
(25.5%)
Maintained by CTDOT
4,044 bridges
(74.5%)
State of Good Repair
3,884 bridges (96.0%)
Poor
160 bridges (4.0%)

In this chart:

  • Based on CTDOT 3/13/20 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,599 bridges
(66.7%)
NHS-NBI bridges
1,795 bridges
(26,357,035.0 ft2 deck area)
(33.3%)
Good
3,862,580 ft2
(393 bridges)
14.7% are in Good Condition
Fair
19,439,639 ft2
(1,329 bridges)
73.7% are in Fair Condition
Poor
3,054,816 ft2
(73 bridges)
11.6% are in Poor Condition

In this chart:

  • Based on CTDOT 3/14/19 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,366 bridges
(25.3%)
Maintained by CTDOT
4,028 bridges
(74.7%)
State of Good Repair
3,844 bridges (95.4%)
Poor
184 bridges (4.6%)

In this chart:

  • Based on CTDOT 3/14/19 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA LTBP InfoBridge

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,541 bridges
(66.5%)
NHS-NBI bridges
1,785 bridges
(26,200,666.0 ft2 deck area)
(33.5%)
Good
3,977,856 ft2
(401 bridges)
15.2% are in Good Condition
Fair
18,558,709 ft2
(1,298 bridges)
70.8% are in Fair Condition
Poor
3,664,101 ft2
(86 bridges)
14.0% are in Poor Condition

In this chart:

  • Based on CTDOT 3/15/18 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,309 bridges
(24.6%)
Maintained by CTDOT
4,017 bridges
(75.4%)
State of Good Repair
3,808 bridges (94.8%)
Poor
209 bridges (5.2%)

In this chart:

  • Based on CTDOT 3/15/18 Snapshot
  • SOGR defined by CTDOT as NBI condition ratings of 5 or higher
  • Poor defined by CTDOT as NBI condition ratings of 4 or lower

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA

NHS-NBI Inventory and Condition

Federal Requirements

Download Data
Non-NHS and NHS Non-NBI bridges
3,521 bridges
(66.4%)
NHS-NBI bridges
1,785 bridges
(26,270,638.0 ft2 deck area)
(33.6%)
Good
4,761,084 ft2
(422 bridges)
18.1% are in Good Condition
Fair
17,584,485 ft2
(1,261 bridges)
66.9% are in Fair Condition
Poor
3,925,069 ft2
(102 bridges)
14.9% are in Poor Condition

In this chart:

  • Based on CTDOT 3/31/17 NBI Submittal
  • Good-Fair-Poor is defined by MAP-21/FAST Act
  • Good condition is defined by NBI condition ratings of 7, 8, or 9
  • Fair condition is defined by NBI condition ratings of 5 or 6
  • Poor condition is defined by NBI condition ratings of 0, 1, 2, 3, or 4 (as of 1/1/18 Poor=SD)

CTDOT-Maintained Inventory and Condition

State Goals

Download Data
Maintained by Others
1,290 bridges
(24.3%)
Maintained by CTDOT
4,016 bridges
(75.7%)
State of Good Repair
3,768 bridges (93.8%)
Poor
248 bridges (6.2%)

In this chart:

  • Based on CTDOT 3/31/17 Snapshot
  • SOGR defined by CTDOT

History

Distribution of NHS Bridges by Decade Built

Download Data

In this chart:

  • Based on National Data available from FHWA

History

% Poor NHS Bridges by Deck Area

Download Data

In this chart:

  • Based on National Data available from FHWA

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of Q1 CY 2024.

Asset Valuation

$17,222,364,000

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,004 bridges:
34,444,728 sqft * $500/sqft = $17.2 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 15% or more Good by deck area on NHS-NBI bridges (Percent Good is established by each state; no Federal minimum for this goal)
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of March 2022.

Asset Valuation

$18,477,194,000

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,054 bridges:
36,954,388 sqft * $500/sqft=$18.5 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 15% or more Good by deck area on NHS-NBI bridges (Percent Good is established by each state; no Federal minimum for this goal)
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of February 2021.

Asset Valuation

$17,065,712,000

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,058 bridges:
34,827,984 sqft * $490/sqft=$17.1 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 20% or more Good by deck area on NHS-NBI bridges (Percent Good is established by each state; no Federal minimum for this goal)
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of February 2021.

Asset Valuation

$17,060,710,730

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,044 bridges:
34,817,777 sqft * $490/sqft=$17.0 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 20% or more Good by deck area on NHS-NBI bridges (Percent Good is established by each state; no Federal minimum for this goal)
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of May 2020.

Asset Valuation

$14,945,774,020

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,028 bridges:
34,757,614 sqft * $430/sqft = $14.9 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 20% or more Good by deck area on NHS-NBI bridges
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of May 2019.

Asset Valuation

$14,857,872,990

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 4,017 bridges:
34,553,193 sqft * $430/sqft = $14.9 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 20% or more Good by deck area on NHS-NBI bridges
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

Performance Projections

The chart on the right depicts bridge condition for various funding scenarios. These were developed through an analysis program using CTDOT bridge condition data, as of May 2017.

Asset Valuation

$15,850,000,000

Asset value is estimated using the replacement value. For bridges, replacement value is the product of deck area and unit construction cost. For 5,306 bridges:
37,734,498 sqft * $420/sqft = $15.9 billion.

Measures & Goals

CTDOT has set the following bridge condition goals:

Federal Requirements:
  • 10% or less Poor by deck area on NHS-NBI bridges (Federal minimum is less than 10% Poor)
  • 20% or more Good by deck area on NHS-NBI bridges
State Goal:
  • 95% or more of State-Maintained bridges in a SOGR (State target)

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,823 NHS-NBI bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,004 CTDOT-maintained bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,823 NHS-NBI bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,054 CTDOT-maintained bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,822 NHS-NBI bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,058 CTDOT-maintained bridges

Download Data

'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,821 NHS-NBI bridges

Download Data
  • CTDOT Snapshot 3/15/21, Pending FHWA NBI Review
  • 'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,044 CTDOT-maintained bridges

Download Data
  • NBI Submittal 3/15/21, Pending FHWA NBI Review
  • 'No Funding' scenario assumes routine bridge maintenance continues, but all capital work is canceled

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,795 NHS-NBI bridges

Download Data
  • Based on funding as of 12/31/19, Pending FHWA NBI Review
  • 'No Funding' scenario includes routine bridge maintenance with other funding.

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,028 CTDOT-maintained bridges

Download Data
  • Based on funding as of 12/31/19, Pending FHWA NBI Review
  • 'No Funding' scenario includes routine bridge maintenance with other funding.

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,785 NHS-NBI bridges

Download Data
  • Based on funding as of 12/31/18

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,017 CTDOT-maintained bridges

Download Data
  • Based on funding as of 12/31/18

NHS-NBI Bridge Performance Projections

Federal Requirements for deck area for 1,785 NHS-NBI bridges

Download Data
  • Based on funding as of 6/30/17

CTDOT-Maintained Bridge Performance Projections

State Goals by number of bridges for 4,016 CTDOT-maintained bridges

Download Data
  • Based on funding as of 6/30/17